South CTB Facility

Project Overview

This construction project awarded to Strata Innovative Services electrical group is a newly designed central tank battery facility. Our team was responsible for implementing the design, installation, and integration of all electrical and instrumentation systems on-site. The scope of work included extensive electrical systems installation and equipment management to support the facility’s operational capabilities.

Electrical Systems and Installation

Strata was tasked with completing the design and installation of the following systems and components to ensure the safe and efficient operation of the site:

  • Well Pad and Battery Panel Racks: Dual-sided racks with shading to accommodate equipment.
  • Electrical System: Comprehensive underground and aboveground electrical system installation.
  • Protective Devices: Overcurrent protection and control devices to ensure system reliability and safety.
  • Site Lighting: Installed six 20-foot poles with double bullhorns and three Class 1/Div 1 catwalk fixtures to provide adequate lighting across the site.
  • Site Grounding: Installed Triad grounding system with a ground ring for electrical safety.
  • Cable Tray and Conduit Systems: Designed and installed cable trays and conduit systems to support the electrical infrastructure.

Major Project Equipment Installed

Strata also coordinated the installation of essential equipment at this CTB, which included:

Production and Test Separators:

  • 1 x 8×20 Horizontal Production Separator
  • 2 x 4×20 Horizontal Test Separators

Treatment and Scrubbing Equipment:

  • 1 x 6×20 Horizontal Heater Treater
  • 1 x 6×20 Horizontal Gas Scrubber
  • 1 x 2×4 Fuel Gas Scrubber

Tank and Storage Systems:

  • 5 x 1,000 BBL Water Tanks
  • 5 x 1,000 BBL Oil Tanks
  • 1 x 1,200 BBL Gun Barrel

Pumps and Compressors:

  • 1 x 5HP Circulating Pump
  • 3 x 100HP Transfer Pumps
  • 3 x 0.5HP Sump Pumps
  • 1 x 15HP Duplex Air Compressor with a 400-gallon tank

Flare and Gas Handling Systems:

  • 1 x Dual High- and Low-pressure Flare with BMS
  • 2 x Flare Scrubbers
  • 1 x Orifice Sales Gas Meter (8”)
  • 1 x 150HP Vapor Recovery Unit (VRU)
  • 1 x 200HP LACT Skid

Cooling and Gas Lift Systems:

  • 1 x Air-cooled Heat Exchanger Oil Cooler (20HP)
  • 1 x 3516 Gas Lift Compressor

Conclusion:

This project involved a comprehensive scope of work, including the design and installation of electrical systems and the coordination of essential oil and gas equipment. Strata
Innovative Solutions successfully delivered the electrical infrastructure, ensuring the site is operational, safe, and up to industry standards.
The site is now fully equipped with the required systems for efficient production and processing, and the team at Strata continues to provide maintenance and support for all installed equipment.